Industrial

Industrial Projects

CLIENT:

A top tier Multinational Corporation for Semiconductor

PROJECT: Penang, Kulim, Vietnam

YEAR: 1991-2007


Involved in their development of their numerous factories as well as retrofitting projects since 1991 till now including their new factory in Vietnam.

Sony Corporation
CLIENT:

Motorola Corporation

PROJECT: Phase 1

YEAR: 1998-1999


Completed the new 110,000 sq. ft. ESG building as the Mechanical Engineer. Services involved include ACMV, fire protection services, building Management system (BMS) and utilities like oil free air (OFA).


PROJECT: Phase 2

YEAR: 1999-2000


We continued with the Phase 2 project of adding another 90,000 sq. ft. to the Phase 1 project. Services involved include ACMV, fire protection services, building management system (BMS) and utilities like OFA.

Motorola

CLIENT:

GOLDEN GATE WAY

PROJECT: Completed design mechanical and electrical servcies and infrastructure for industrial park developer at batu kawan. Penang. Malaysia


LOCATION: Batu Kawan, Penang. Malaysia

YEAR: 2021

Sony Corporation

CLIENT:

COMPASS IP SDN BHD

PROJECT: "Managed Industrial Park (MIP)" planning and design for mechanical and electrical services for the 220 acres land.


YEAR: 2023

Sony Corporation

CLIENT:

AVX / TPC MALAYSIA SDN BHD

PROJECT: "Completed the design M&E services which include clean room, air conditioning, fire protection, electrical, OFA, PCW, vacuum services and supervising of the multistorey production floor with total built up of 250,000 sq ft.


YEAR: 2019

Sony Corporation

CLIENT:

ECO MEDI GLOVE Sdn Bhd

PROJECT: Design mechanical and electrical services for the various production plant and offices.


LOCATION: Taiping. Perak

YEAR: 2021, 2022

Sony Corporation

CLIENT:

PLEXUS XIAMEN (CHINA)

PROJECT: Completed design and supervision for the M&E services include air conditioning, fire protection (FM), electrical services for the production building. Built up area 200,000 sq ft.


LOCATION: Xiamen, China

YEAR: 2012

Sony Corporation

CLIENT:

PLEXUS Manufacturing Sdn Bhd

PROJECT: Completed design mechanical and electrical services include air conditioning, clean room, fire protection services (FM), electrical and process for the 550,000 sq ft manufacturing plant.


LOCATION: Bayan Lepas, Penang

YEAR: 2011

Sony Corporation

CLIENT:

OSRAM OPTO SEMI CONDUCTOR (m) Sdn Bhd

PROJECT: Completed the design and supervision of mechanical and electrical services which include process, clean room, gaseous system for the WAFER FAB plant at Kulim.


LOCATION: Kulim , Kedah, Malaysia

YEAR: 2017

Sony Corporation

CLIENT:

B BRAUN MEDICAL INDUSTRIES Sdn Bhd

PROJECT: Completed the design for mechanical and electrical services with clean room and process for the multistorey manufacturing plant . Total built up area is more then 1,000,000 sq ft.


LOCATION: Bayan Lepas, Penang

YEAR: 2017

Sony Corporation

CLIENT:

VAT MANUFACTURING MALAYSIA Sdn Bhd

PROJECT: Completed design and built mechanical and electrical services include ISO6 and ISO8 clean room , fire protection services, electrical and process for the 300,000 sq ft manufacturing plant.


YEAR: 2018

Sony Corporation

CLIENT:

BOON SIEW HONDA Sdn Bhd

PROJECT: Completed design and construction for mechanical and electrical services for the 700,000 sq ft automotive manufacturing plant.


LOCATION: Batu Kawan, Prai

YEAR: 2012

Sony Corporation

CLIENT:

A Top Tier multinational corporation involved in seminconductor business

PROJECT: Completed design mechanical and electrical services include data center over 2,000,000 sq ft manufacturing, office and warehouse for both kulim, penang, vietnam.


YEAR: From 2009 -2023

Sony Corporation

CLIENT:

AMBU (m) Sdn Bhd

PROJECT: Completed various phases of AMBU building M&E services.


LOCATION: Bayan Lepas Free Trade Zone. Penang, Malaysia

YEAR: 2012

Sony Corporation

CLIENT:

CLASS A (m) Sdn Bhd

PROJECT: 3 storey manufacturing plant at Batu Kawan, Penang.


LOCATION: Batu Kawan, Penang

YEAR: 2017

Sony Corporation

CLIENT:

IBIDEN (M) Sdn Bhd

PROJECT: Completed mechanical and electrical services design and construction. Design and supervise the upgrading of 33kV intake supply to 132kV electrical system for the 700,000 sq ft production plant.


LOCATION: Bukit Minyak. Penang. Malaysia

YEAR: 2011

Sony Corporation

CLIENT:

NESTLE

PROJECT: Completed mechanical and electrical services design for the BINTANG, GALAXY project at Shah Alam Batu Tiga


YEAR: 2014

Sony Corporation

CLIENT:

QDOS FLEXCIRCUITS Sdn Bhd

PROJECT: QDOS 3 storey manufacturing and office plant at Batu Kawan industrial park.


LOCATION: Batu Kawan , Penang. Malaysia

YEAR: 2018

Sony Corporation

CLIENT:

NESTLE MAUFACTURING (m) Sdn Bhd

PROJECT: Nestle Manufacturing Plant at Batu Tiga , Shah Alam. Bintang, Galaxy.


LOCATION: Batu Tiga, Shah Alam, Selangor

YEAR: 2015

Sony Corporation

CLIENT:

THE LARYNGEAL MASK COMPANY (M) Sdn Bhd

PROJECT:
TELEFLEX manufacturing plant at kulim and kamunting.
Completed the design mechanical, electrical and process services for the manufaturing plant.


LOCATION:
Kulim high tech park, Kedah. Malaysia
Kamunting industrial park, Perak. Malaysia


YEAR: 2019, 2021

Sony Corporation

CLIENT:

ORYX ADVANCED MATERIAL Sdn Bhd

PROJECT:
MANUFACTURING PLANT AT BAYAN LEPAS
Completed the design mechanical, electrical and process services for the manufaturing plant from green field and include the new extension


LOCATION: Bayan Lepas Free Trade Zone, Penang. Malaysia

YEAR: 2016

Sony Corporation

CLIENT:

QCELL / HANHWA QCELL

PROJECT:
HANHWA QCEL SOLAR MANUFACTURING PLANT
Completed mechanical, electrical, process design and upgraded electrical supply from 33kv to 132kV electrical system for the manufacturing plant.


LOCATION: Cyberjaya, Selangor. Malaysia

YEAR: 2009, 2015, 2019

Sony Corporation

CLIENT:

Linear Semi-conductors

PROJECT: Phase 1

YEAR: 1995-1996


Completed the cleanroom (Class 10,000) design and air conditioning expansion.


PROJECT: Phase 2

YEAR: 1999-2000


Completed the mechanical services for Phase 2 expansion of approximately 50,000 sq. ft. Services involved include ACMV, fire protection services, processes like scrubbed exhaust, OFA, vacuum, etc.

CLIENT:

Sony Corporation, Prai

PROJECT: Phase 1

YEAR: 1998-1999


Completed the two projects for the addition of office/locker building and a building to house the abechoic chamber. Involved in the M & E services and have to upgrade existing services.


PROJECT: Phase 2

YEAR: 2000-2001


Completed upgrading of the entire air conditioning system of the Sony plants from water cooled packaged units to chilled water system. Approximately floor area involved is 1 million sq. ft. This works on a concept of a centralised cooling system like district cooling serving 3 different building blocks. Coordination and management is of extreme importance as the project of the conversion of the WCPU's to chilled water AHU's can only be carried out during the holiday shutdown.

Sony Corporation

CLIENT:

Sony Corporation

PROJECT: Factory in Tikam Batu, Kedah.

YEAR: 2003


Completed an entire new factory of about 60,000 sq. ft. Services include the entire ACMV, fire protection services, utilities services and electrical services.

CLIENT:

Altera Corporation

PROJECT: Phase 1

YEAR: 1997-1998


Completed the entire mechanical services of the research and development building. Services involved include ACMV, fire protection services, lift services and utilities like compressed air and vacuum.


PROJECT: Phase 2

YEAR: 2000-2001


Complete the entire mechanical services which is a 3 storey research building of approximately 185,000 sq. ft. Services involved include ACMV, fire protection services, lift services, BMS and utilities like compressed air and vacuum.

Sony Corporation
CLIENT:

BASF (M) Sdn bhd, Shah Alam malaysia

PROJECT: Food & Feed Plant

YEAR: 2000


Completed the design and construction for mechanical and electrical services with GMP compliance for air conditioning, fire protection, electrical, compress air system.

Sony Corporation

CLIENT:

BASF (M) Sdn bhd, Shah Alam malaysia

PROJECT: Food & Feed Plant

YEAR: 2000


Completed the design and construction for mechanical and electrical services with GMP compliance for air conditioning, fire protection, electrical, compress air system. 

CLIENT:

SCI Manufacturing

PROJECT: Design Of Proposed Expansion

YEAR: 2001


Completed the entire mechanical and electrical services for the expansion of an existing facilities. The design was done up to tender stage of 180,000 sq. ft. The services include L.T. and H.T. (33kV) electrical services, air conditioning and ventilation, fire protection services (FM), utilities, etc.

CLIENT:

Xolox Corporation, Prai

PROJECT:

YEAR: 1997-1999


Completed the M & E services to fit-up and existing factory building. Involved in the initial fit-up work in 1997 and subsequently.

CLIENT:

Applied Magnetics

PROJECT:

YEAR: 1993


A disk drive head manufacturer in Penang. Completed the renovations of part of their factory (5,000 sq. ft.) Involved in the entire M & E services including L.T., process works like compressed air, D.I. water, fire protection services, etc.


PROJECT: Phase 2

YEAR: 1995


Renovations works (10,000 sq. ft.). Involved in their process works and electrical services.


PROJECT: Larry Cleanroom Project

YEAR: 1995


Involved in their D.I. water services, electrical services, process cooling, fire protection services, etc.


PROJECT: Expansion of ESD Project

YEAR: 1998


Completed upgrading of utilities like exhaust system, OFA, etc.

Applied Magnetics

CLIENT:

Read Rite Corporation, Prai

PROJECT: Upgrading Works

YEAR: 1998


Completed the upgrading of their Class 10,000 cleanroom by improving the temperature and increasing the relative humidity of the cleanroom services include upgrading ductwork, AHU's, fire protection services and electrical services.

CLIENT:

Trans Capital / Castlewood

PROJECT: New Plant, Prai

YEAR: 1993


A disk drive sub-assembly plant/PCB/SMT manufacturer. Involved in their renovations of M & E services for their new plant as well as upgrading their existing services include cleanroom (Class 100K), air conditioning, ventilation, compressed air, electrical & fire protection services.


PROJECT: Cleanroom Design

YEAR: 1997-1998


Completed the design of their expansion programme to build 12,000 sq. ft. of Class 100 cleanroom and 3,000 sq. ft. of Class 1,000 cleanroom for the removable hard disk for Castlewood.

CLIENT:

UMW Corporation

PROJECT:

YEAR: 1997-1998


Completed the entire M & E engineer for a office/warehouse/services centre. Services involved ACMV, fire protection services, compressed air electrical and telephone and I.T. services.

CLIENT:

Swiss Profile, Prai

PROJECT:

YEAR: 1996


Completed the entire mechanical services for a watch components factory. Services include air conditioning, fire protection services and utilities services.

CLIENT:

Sinetimed Latex, Taiping

PROJECT: Old Plant

YEAR: 1994


A latex gloves manufacturer and completed a Class 1000 Cleanroom for their packing area.


PROJECT: New Plant

YEAR: 1997-1998


Completed the design of their entire M & E services for their new building which includes a Class 10 Cleanroom (3,600 sq. ft.) and Class 1,000 Cleanroom (2,000 sq. ft.). Other services involved include RODI system and oil free air.

CLIENT:

Sequel, Prai

PROJECT:

YEAR: 1996


Completed entire M & E design of a disk drive repair factory of approximately 25,000 sq. ft. Services include the design of a Class 1,000 Cleanroom, air conditioning, ventilation, electrical, fire protection and utilities services.

CLIENT:

R. Frazier

PROJECT:

YEAR: 1997


Completed the entire M & E design for a 20,000 sq. ft. factory and involve in rework and salvaging of electronic parts.

CLIENT:

Nitcom Technology

PROJECT:

YEAR: 1996


Completed the M & E services for a SMT/Cleanroom Sub Assembly factory of 40,000 sq. ft. Services include air conditioning, ventilation, electrical, cleanroom (Class 10,000 and 100,000), fire protection and utilities.

CLIENT:

AIC Semi-conductor, Kulim

PROJECT: Phase 2

YEAR: 2000-2001


Completed the entire M & E works of Phase 2 expansion. The work include Class 10K Cleanroom as well as air conditioning and ventilation services, utilities like RODI, OFA, Vacuum, Process Cooling Water, RODI, Waste Water Treatment etc., fire protection services, electrical services (H.T. & L.T.). Total floor area is approximately 75,000 sq. ft.

AIC Semi-conductor

CLIENT:

Safe Skin Corporation

PROJECT: Design Of Cleanroom

YEAR: 1992


Completed the entire Class 100 Cleanroom design of approx. 1,200 sq. ft. Services include Architecture works, mechanical & electrical services.

CLIENT:

Linear Cooling Tower

PROJECT:

YEAR: 1992


Completed the entire mechanical services for a factory of approx. 150,000 sq. ft. Services involved include, air conditioning, fire protection, compressed air, etc.

Linear Cooling Tower

CLIENT:

Leader Cable Industry

PROJECT: Design Of Cleanroom

YEAR: 1993


Together with our sister company, Internet Technology Sdn. Bhd. completed the construction of a Class 10,000 Cleanroom for their assembly.

CLIENT:

Cleanroom Laundry Services

PROJECT:

YEAR: 1990


Completed the entire design for a Class 1,000/100 Cleanroom Laundry (1,500 sq. ft.) Services include Architecture, mechanical and electrical services.

CLIENT:

Penang Seagate Industries

PROJECT: Extension Of Cleanroom

YEAR: 2003


Involved in the design of the 'shell' to support a future Class 100/1000 cleanroom for their proposed ALD project.

CLIENT:

Mafira-Valentec

PROJECT:

YEAR: 1991


Completed the entire design and supervision of a Class 100 Cleanroom of approx. 1,000 sq. ft. Services include Architecture works mechanical and electrical services.

CLIENT:

Denko Corporation, Kulim

PROJECT: Design Of Cleanroom

YEAR: 1998


Together with our sister company, Selamas Sdn. Bhd., a cleanroom 'turnkey' project was successfully completed for a Class 100,000 cleanroom of 1,500 sq. ft.

CLIENT:

OmniGrace Thailand Ltd.

PROJECT: Design Of Cleanroom

YEAR: 1998


Rubber glove factory in Haadyai, Thailand. Worked with our sister company, Internet Technology to complete the entire Class 1,000/10,000 Cleanroom.

CLIENT:

Polar Twin Advance

PROJECT: Design Of Cleanroom & M&E Services

YEAR: 2001


Completed the entire mechanical and electrical services for a sub-contractor/testing plant in Prai of about 65,000 sq. ft. Services include air conditioning, fire protection services, utilities, electrical services.

Polar Twin Advance

CLIENT:

Limileds Lighting (M) Sdn. Bhd.

PROJECT: Project Management On Behalf Of Client

YEAR: 2004


Involved as in independent checker for all the M & E and CSA works for the entire Renovations of an existing building to facilitate the new production spaces for a client manufacturing LED's

CLIENT:

Sanyo Electric (PG) Sdn. Bhd.

PROJECT: Penang

YEAR: 2004


Renovation and extension to existing office and factory at Taman Perindustrian Bayan Lepas (FTZ) Penang

CLIENT:

Micro Carbide Sdn. Bhd

PROJECT: Penang

YEAR: 2005-2006


Completed the entire M&E services for a SME Factory in Bayan Lepas of 50,000 sq. ft. including The process utilities.

CLIENT:

Microlead Sdn. Bhd

PROJECT: Penang

YEAR: 2005-2006


Completed the entire M&E services for another SME factory in Bayan Lepas of 30,000 sq. ft.

CLIENT:

Laird Technologies

PROJECT: Phase 1, Chennai, India

YEAR: 2006-2007


Responsible for the design tender exercise and project management of the M&E services. Trades include air conditioning, electrical services, fire protection, utilities (compressed air) and IT services.

CLIENT:

Q.CELL MALAYSIA (Local consultant for M+W Zander)

PROJECT: Solar Panel Manufacturing Facility

YEAR: 2008-2009


Three-storey solar-cell factory with eight production lines has an annual output of 500 megawatts (peak) at Selangor Science Park 2, Selangor, Malaysia.

Q Cell

CLIENT:

Ambu Sdn. Bhd.

PROJECT: Penang

YEAR: 2005-2006


Completed the entire M&E services for a Danish Pharmaceutical factory of 50,000 sq. ft. in Bayan Lepas including a Class 100K cleanroom with RH controls.

CLIENT:

SYMMETRY MEDICAL MALAYSIA

PROJECT: Medical Equipments Manufacturing Plant in Penang Science Park

YEAR: Under Planning Stages


2 storey office and single storey factory for electro-polishing, passivation and heavy forging production facility.

CLIENT:

B.Braun Medical Industries Sdn. Bhd.

PROJECT: Extension & Renovations at Phase 2 of Bayan Lepas Free Trade Zone

YEAR: 2009 - now (Under Construction)


3 storey manufacturing facility of 300,000 sq. ft. with Class D cleanrooms. Involved in the entire M&E facilities including air conditioning, mechanical ventilation, fire protection, LV/HV electrical services, process cooling water, oil free air and BMS.

Dell
CLIENT:

DELL GLOBAL BUSIINESS CENTER

PROJECT: Business Call Center

YEAR: 2007


5 storey business call center in Cyberjaya Flagship Zone, Cyberjaya, Selangor.

Dell