PROJECT: Penang, Kulim, Vietnam
YEAR: 1991-2007
Involved in their development of their numerous factories as well as retrofitting projects since 1991 till now including their new factory in Vietnam.
PROJECT: Phase 1
YEAR: 1998-1999
Completed the new 110,000 sq. ft. ESG building as the Mechanical Engineer. Services involved include ACMV, fire protection services, building Management system (BMS) and utilities like oil free air (OFA).
PROJECT: Phase 2
YEAR: 1999-2000
We continued with the Phase 2 project of adding another 90,000 sq. ft. to the Phase 1 project. Services involved include ACMV, fire protection services, building management system (BMS) and utilities like OFA.
CLIENT:
PROJECT: Completed design mechanical and electrical servcies and infrastructure for industrial park developer at batu kawan. Penang. Malaysia
LOCATION: Batu Kawan, Penang. Malaysia
YEAR: 2021
CLIENT:
PROJECT: "Managed Industrial Park (MIP)" planning and design for mechanical and electrical services for the 220 acres land.
YEAR: 2023
CLIENT:
PROJECT: "Completed the design M&E services which include clean room, air conditioning, fire protection, electrical, OFA, PCW, vacuum services and supervising of the multistorey production floor with total built up of 250,000 sq ft.
YEAR: 2019
CLIENT:
PROJECT: Design mechanical and electrical services for the various production plant and offices.
LOCATION: Taiping. Perak
YEAR: 2021, 2022
CLIENT:
PROJECT: Completed design and supervision for the M&E services include air conditioning, fire protection (FM), electrical services for the production building. Built up area 200,000 sq ft.
LOCATION: Xiamen, China
YEAR: 2012
CLIENT:
PROJECT: Completed design mechanical and electrical services include air conditioning, clean room, fire protection services (FM), electrical and process for the 550,000 sq ft manufacturing plant.
LOCATION: Bayan Lepas, Penang
YEAR: 2011
CLIENT:
PROJECT: Completed the design and supervision of mechanical and electrical services which include process, clean room, gaseous system for the WAFER FAB plant at Kulim.
LOCATION: Kulim , Kedah, Malaysia
YEAR: 2017
CLIENT:
PROJECT: Completed the design for mechanical and electrical services with clean room and process for the multistorey manufacturing plant . Total built up area is more then 1,000,000 sq ft.
LOCATION: Bayan Lepas, Penang
YEAR: 2017
CLIENT:
PROJECT: Completed design and built mechanical and electrical services include ISO6 and ISO8 clean room , fire protection services, electrical and process for the 300,000 sq ft manufacturing plant.
YEAR: 2018
CLIENT:
PROJECT: Completed design and construction for mechanical and electrical services for the 700,000 sq ft automotive manufacturing plant.
LOCATION: Batu Kawan, Prai
YEAR: 2012
CLIENT:
PROJECT: Completed design mechanical and electrical services include data center over 2,000,000 sq ft manufacturing, office and warehouse for both kulim, penang, vietnam.
YEAR: From 2009 -2023
CLIENT:
PROJECT: Completed various phases of AMBU building M&E services.
LOCATION: Bayan Lepas Free Trade Zone. Penang, Malaysia
YEAR: 2012
CLIENT:
PROJECT: 3 storey manufacturing plant at Batu Kawan, Penang.
LOCATION: Batu Kawan, Penang
YEAR: 2017
CLIENT:
PROJECT: Completed mechanical and electrical services design and construction. Design and supervise the upgrading of 33kV intake supply to 132kV electrical system for the 700,000 sq ft production plant.
LOCATION: Bukit Minyak. Penang. Malaysia
YEAR: 2011
CLIENT:
PROJECT: Completed mechanical and electrical services design for the BINTANG, GALAXY project at Shah Alam Batu Tiga
YEAR: 2014
CLIENT:
PROJECT: QDOS 3 storey manufacturing and office plant at Batu Kawan industrial park.
LOCATION: Batu Kawan , Penang. Malaysia
YEAR: 2018
CLIENT:
PROJECT: Nestle Manufacturing Plant at Batu Tiga , Shah Alam. Bintang, Galaxy.
LOCATION: Batu Tiga, Shah Alam, Selangor
YEAR: 2015
CLIENT:
PROJECT:
TELEFLEX manufacturing plant at kulim and kamunting.
Completed the design mechanical, electrical and process services for the manufaturing plant.
LOCATION:
Kulim high tech park, Kedah. Malaysia
Kamunting industrial park, Perak. Malaysia
YEAR: 2019, 2021
CLIENT:
PROJECT:
MANUFACTURING PLANT AT BAYAN LEPAS
Completed the design mechanical, electrical and process services for the manufaturing plant from green field and include the new extension
LOCATION: Bayan Lepas Free Trade Zone, Penang. Malaysia
YEAR: 2016
CLIENT:
PROJECT:
HANHWA QCEL SOLAR MANUFACTURING PLANT
Completed mechanical, electrical, process design and upgraded electrical supply from 33kv to 132kV electrical system for the manufacturing plant.
LOCATION: Cyberjaya, Selangor. Malaysia
YEAR: 2009, 2015, 2019
CLIENT:
PROJECT: Phase 1
YEAR: 1995-1996
Completed the cleanroom (Class 10,000) design and air conditioning expansion.
PROJECT: Phase 2
YEAR: 1999-2000
Completed the mechanical services for Phase 2 expansion of approximately 50,000 sq. ft. Services involved include ACMV, fire protection services, processes like scrubbed exhaust, OFA, vacuum, etc.
CLIENT:
PROJECT: Phase 1
YEAR: 1998-1999
Completed the two projects for the addition of office/locker building and a building to house the abechoic chamber. Involved in the M & E services and have to upgrade existing services.
PROJECT: Phase 2
YEAR: 2000-2001
Completed upgrading of the entire air conditioning system of the Sony plants from water cooled packaged units to chilled water system. Approximately floor area involved is 1 million sq. ft. This works on a concept of a centralised cooling system like district cooling serving 3 different building blocks. Coordination and management is of extreme importance as the project of the conversion of the WCPU's to chilled water AHU's can only be carried out during the holiday shutdown.
CLIENT:
PROJECT: Factory in Tikam Batu, Kedah.
YEAR: 2003
Completed an entire new factory of about 60,000 sq. ft. Services include the entire ACMV, fire protection services, utilities services and electrical services.
PROJECT: Phase 1
YEAR: 1997-1998
Completed the entire mechanical services of the research and development building. Services involved include ACMV, fire protection services, lift services and utilities like compressed air and vacuum.
PROJECT: Phase 2
YEAR: 2000-2001
Complete the entire mechanical services which is a 3 storey research building of approximately 185,000 sq. ft. Services involved include ACMV, fire protection services, lift services, BMS and utilities like compressed air and vacuum.
PROJECT: Food & Feed Plant
YEAR: 2000
Completed the design and construction for mechanical and electrical services with GMP compliance for air conditioning, fire protection, electrical, compress air system.
CLIENT:
PROJECT: Food & Feed Plant
YEAR: 2000
Completed the design and construction for mechanical and electrical services with GMP compliance for air conditioning, fire protection, electrical, compress air system.
CLIENT:
PROJECT: Design Of Proposed Expansion
YEAR: 2001
Completed the entire mechanical and electrical services for the expansion of an existing facilities. The design was done up to tender stage of 180,000 sq. ft. The services include L.T. and H.T. (33kV) electrical services, air conditioning and ventilation, fire protection services (FM), utilities, etc.
CLIENT:
PROJECT:
YEAR: 1997-1999
Completed the M & E services to fit-up and existing factory building. Involved in the initial fit-up work in 1997 and subsequently.
PROJECT:
YEAR: 1993
A disk drive head manufacturer in Penang. Completed the renovations of part of their factory (5,000 sq. ft.) Involved in the entire M & E services including L.T., process works like compressed air, D.I. water, fire protection services, etc.
PROJECT: Phase 2
YEAR: 1995
Renovations works (10,000 sq. ft.). Involved in their process works and electrical services.
PROJECT: Larry Cleanroom Project
YEAR: 1995
Involved in their D.I. water services, electrical services, process cooling, fire protection services, etc.
PROJECT: Expansion of ESD Project
YEAR: 1998
Completed upgrading of utilities like exhaust system, OFA, etc.
CLIENT:
PROJECT: Upgrading Works
YEAR: 1998
Completed the upgrading of their Class 10,000 cleanroom by improving the temperature and increasing the relative humidity of the cleanroom services include upgrading ductwork, AHU's, fire protection services and electrical services.
CLIENT:
PROJECT: New Plant, Prai
YEAR: 1993
A disk drive sub-assembly plant/PCB/SMT manufacturer. Involved in their renovations of M & E services for their new plant as well as upgrading their existing services include cleanroom (Class 100K), air conditioning, ventilation, compressed air, electrical & fire protection services.
PROJECT: Cleanroom Design
YEAR: 1997-1998
Completed the design of their expansion programme to build 12,000 sq. ft. of Class 100 cleanroom and 3,000 sq. ft. of Class 1,000 cleanroom for the removable hard disk for Castlewood.
CLIENT:
PROJECT:
YEAR: 1997-1998
Completed the entire M & E engineer for a office/warehouse/services centre. Services involved ACMV, fire protection services, compressed air electrical and telephone and I.T. services.
CLIENT:
PROJECT:
YEAR: 1996
Completed the entire mechanical services for a watch components factory. Services include air conditioning, fire protection services and utilities services.
CLIENT:
PROJECT: Old Plant
YEAR: 1994
A latex gloves manufacturer and completed a Class 1000 Cleanroom for their packing area.
PROJECT: New Plant
YEAR: 1997-1998
Completed the design of their entire M & E services for their new building which includes a Class 10 Cleanroom (3,600 sq. ft.) and Class 1,000 Cleanroom (2,000 sq. ft.). Other services involved include RODI system and oil free air.
CLIENT:
PROJECT:
YEAR: 1996
Completed entire M & E design of a disk drive repair factory of approximately 25,000 sq. ft. Services include the design of a Class 1,000 Cleanroom, air conditioning, ventilation, electrical, fire protection and utilities services.
CLIENT:
PROJECT:
YEAR: 1997
Completed the entire M & E design for a 20,000 sq. ft. factory and involve in rework and salvaging of electronic parts.
CLIENT:
PROJECT:
YEAR: 1996
Completed the M & E services for a SMT/Cleanroom Sub Assembly factory of 40,000 sq. ft. Services include air conditioning, ventilation, electrical, cleanroom (Class 10,000 and 100,000), fire protection and utilities.
PROJECT: Phase 2
YEAR: 2000-2001
Completed the entire M & E works of Phase 2 expansion. The work include Class 10K Cleanroom as well as air conditioning and ventilation services, utilities like RODI, OFA, Vacuum, Process Cooling Water, RODI, Waste Water Treatment etc., fire protection services, electrical services (H.T. & L.T.). Total floor area is approximately 75,000 sq. ft.
CLIENT:
PROJECT: Design Of Cleanroom
YEAR: 1992
Completed the entire Class 100 Cleanroom design of approx. 1,200 sq. ft. Services include Architecture works, mechanical & electrical services.
PROJECT:
YEAR: 1992
Completed the entire mechanical services for a factory of approx. 150,000 sq. ft. Services involved include, air conditioning, fire protection, compressed air, etc.
CLIENT:
PROJECT: Design Of Cleanroom
YEAR: 1993
Together with our sister company, Internet Technology Sdn. Bhd. completed the construction of a Class 10,000 Cleanroom for their assembly.
CLIENT:
PROJECT:
YEAR: 1990
Completed the entire design for a Class 1,000/100 Cleanroom Laundry (1,500 sq. ft.) Services include Architecture, mechanical and electrical services.
CLIENT:
PROJECT: Extension Of Cleanroom
YEAR: 2003
Involved in the design of the 'shell' to support a future Class 100/1000 cleanroom for their proposed ALD project.
CLIENT:
PROJECT:
YEAR: 1991
Completed the entire design and supervision of a Class 100 Cleanroom of approx. 1,000 sq. ft. Services include Architecture works mechanical and electrical services.
CLIENT:
PROJECT: Design Of Cleanroom
YEAR: 1998
Together with our sister company, Selamas Sdn. Bhd., a cleanroom 'turnkey' project was successfully completed for a Class 100,000 cleanroom of 1,500 sq. ft.
CLIENT:
PROJECT: Design Of Cleanroom
YEAR: 1998
Rubber glove factory in Haadyai, Thailand. Worked with our sister company, Internet Technology to complete the entire Class 1,000/10,000 Cleanroom.
PROJECT: Design Of Cleanroom & M&E Services
YEAR: 2001
Completed the entire mechanical and electrical services for a sub-contractor/testing plant in Prai of about 65,000 sq. ft. Services include air conditioning, fire protection services, utilities, electrical services.
CLIENT:
PROJECT: Project Management On Behalf Of Client
YEAR: 2004
Involved as in independent checker for all the M & E and CSA works for the entire Renovations of an existing building to facilitate the new production spaces for a client manufacturing LED's
CLIENT:
PROJECT: Penang
YEAR: 2004
Renovation and extension to existing office and factory at Taman Perindustrian Bayan Lepas (FTZ) Penang
CLIENT:
PROJECT: Penang
YEAR: 2005-2006
Completed the entire M&E services for a SME Factory in Bayan Lepas of 50,000 sq. ft. including The process utilities.
CLIENT:
PROJECT: Penang
YEAR: 2005-2006
Completed the entire M&E services for another SME factory in Bayan Lepas of 30,000 sq. ft.
CLIENT:
PROJECT: Phase 1, Chennai, India
YEAR: 2006-2007
Responsible for the design tender exercise and project management of the M&E services. Trades include air conditioning, electrical services, fire protection, utilities (compressed air) and IT services.
PROJECT: Solar Panel Manufacturing Facility
YEAR: 2008-2009
Three-storey solar-cell factory with eight production lines has an annual output of 500 megawatts (peak) at Selangor Science Park 2, Selangor, Malaysia.
CLIENT:
PROJECT: Penang
YEAR: 2005-2006
Completed the entire M&E services for a Danish Pharmaceutical factory of 50,000 sq. ft. in Bayan Lepas including a Class 100K cleanroom with RH controls.
CLIENT:
PROJECT: Medical Equipments Manufacturing Plant in Penang Science Park
YEAR: Under Planning Stages
2 storey office and single storey factory for electro-polishing, passivation and heavy forging production facility.
PROJECT: Extension & Renovations at Phase 2 of Bayan Lepas Free Trade Zone
YEAR: 2009 - now (Under Construction)
3 storey manufacturing facility of 300,000 sq. ft. with Class D cleanrooms. Involved in the entire M&E facilities including air conditioning, mechanical ventilation, fire protection, LV/HV electrical services, process cooling water, oil free air and BMS.
PROJECT: Business Call Center
YEAR: 2007
5 storey business call center in Cyberjaya Flagship Zone, Cyberjaya, Selangor.